Revamping of two fire tube boilers, steam production 20t/ha at 15 bar pressure.
Work Completed:
Installation and testing of the combustion gas temperature regulation system with activation of the heat recovery unit in the chimney.
Activation of Remote Monitoring System (Opticloud).
Challenge:
Reduction of the temperature of the combustion gases, while increasing the temperature of the feedwater, to increase the efficiency of the boiler and reduce gas consumption.
Success:
Positive result of the intervention, achieving an efficiency of 96% with a combustion gas temperature of 105ºC, compared to the previous values of 155ºC and an efficiency of 94%