Maintenance and commissioning of industrial boilers

Start / Case studies

Industrial Burner Regulation in a 40 t/h Steam Boiler

Project

Description

Burner adjustment to eliminate vibrations under minimum load conditions. Work carried out in collaboration with the technical service of John Zink (burner manufacturer). The entire combustion curve has been adjusted to achieve maximum power.

Installation details:

Type: 38MW steam production boiler, with a capacity of 40 t/h.

System: Boiler equipped with a gas and air flow measurement system, guaranteeing at all times the optimal relationship between the gas flow and the combustion air flow.

Customer

RWE

Location

Netherlands

Service

Maintenance and regulation

Year of the project

2025

Project Gallery