Maintenance and commissioning of industrial boilers

Start / Case studies

15t/h steam boiler, start-up

Project

Description

 

Firetube boiler, steam production 15t/h

Work Completed:

Start-up of a fire-tube steam boiler with HE system (energy recovery by means of 2 economizers [ECO] and an air preheating system) to obtain an efficiency of 97.5% and a flue gas temperature of 90 ºC.
Steam production boiler with a capacity of 15 t/h.
Boiler with energy recovery system that needs to be optimally calibrated in order to obtain the required performance.

Customer

AGROBIO

Location

Leon, Mexico

Service

Start-up

Year of the project

2025

Project Gallery

Scroll to Top