Maintenance and commissioning of industrial boilers

Start / Case studies

Start-up, Steam 8t/h 18bar

Project

Description

Start-up of a fire-tube steam boiler with HE system (energy recovery by means of 2 economizers [ECO] and an air preheating system) to obtain an efficiency of 97.5% and a flue gas temperature of 90 ºC.

flue gas recovery system for NOx reduction.
Steam production boiler with a capacity of 8.0 t/ha at a pressure of 15 bar.
Boiler with energy recovery system for optimal calibration in order to obtain the required performance.

Customer

Extremadura Cardboard

Location

Navalmoral de la Mata - Spain

Service

Installation of a steam generation system

Year of the project

2025

Project Gallery

Scroll to Top